Supply planning

Know what your network can carry, and what it costs.

SIMCEL tests every demand scenario against the real limits of your plants, warehouses and suppliers. It shows what you can deliver, what you must hold and what it costs, before sales and finance commit to the number.

The plan looks fine until supply says otherwise.

Sales commits to a number. Finance builds the budget on it. Then the plants and the warehouses show that the volume does not fit. The feasibility check comes last, when the two other functions have already agreed.

The commercial number is not the constraint.

A plan can look right until it meets physical capacity.

The answer arrives too late.

Feasibility is checked after sales and finance have aligned.

The debate becomes spreadsheet reconciliation.

Teams compare versions, not tested options.

Capacity is not one number.

A plant's capacity depends on the mix it runs. A truck costs the same half empty. A minimum order does not care about your forecast. SIMCEL models these flows as they happen: purchase, production, transfer and delivery, transaction by transaction. So the plan it returns is one the plant can run.

Network load, next 12 months

Sites
4
Months over capacity
3
First break
Krakow plant · Apr 27
Network load, next 12 months
SiteNov 26Dec 26Jan 27Feb 27Mar 27Apr 27
82%88%79%71%86%97%
91%97%88%80%96%108%
76%92%71%65%80%94%
68%74%66%60%72%85%
  • Under 85%
  • 85 to 100%
  • Over capacity

Krakow plant · Load

Plants, hubs and DCs

Each site's load, month by month, against its real limits.

Flows, not averages

Purchase, production, transfer and distribution, as transactions.

Consequences already attached

What cannot be served, what must be held, and what it costs.

Extension

Materials and suppliers

Lead times, minimum orders and sourcing options join the same model.

See where the network breaks, and what it means.

Capacity

Each plant, hub and DC shows its monthly load as a share of capacity. Overloaded periods surface immediately.

See the first break

Find which site binds first and when.

Network verdict

Can the network carry this plan?

Illustrative figures.

The right service level is not 99%.

Most companies set a service target by habit, then pay for the stock it needs. SIMCEL simulates the policy itself. Service level, safety stock and order quantity are tested against margin, write-offs and the cost of capital. You see where profit peaks, product by product, and you set the target there.

FMCG, Asia Pacific

60 service-level settings simulated against profit

Profit-optimal point: 96%

Consumer goods, APAC

Forecast and inventory policies reviewed

44 days less inventory

Service level against profit

Current target: 99%
Gross profit
€9.2M
Inventory cover
80 days
Lost sales
€0.4M
Service level against profit
Product familyProfit-optimal targetProfit gain
Analgesics96.5%+€0.4M
Cough & cold94%+€0.9M
Vitamins97.5%+€0.2M
Digestive95%+€0.6M

Target set at the profit-optimal point, not at 99%.

Compare the trade-offs side by side.

A supply scenario is built from events: a line down for four weeks, a supplier lost, a new warehouse, a longer lead time. Each one is priced in service, revenue and working capital before it happens, and set beside the current plan.

Scenarios against the current plan

Scenarios against the current plan
KPICurrent operating planKrakow line down 4 weeks
Service level (OTIF)97.1%89.8%−7.3%
Lost revenue€0.4M€5.6M+5.2M
Peak site load97%121%+24%
Inventory cover (days)5261+9
Working capital€18.2M€21.4M+3.2M
EBIT€24.8M€21.3M−3.5M
First constraintNoneKrakow plant · Feb 27

Current operating plan

The reference: capacity, service and working capital.

More demand, more pressure

Where the extra volume binds first.

A network shock

The service and revenue impact, priced in advance.

A dairy manufacturer in Australia tested a shorter delivery lead time in the simulator. Its time-to-survive a disruption and its profit at risk both changed materially.

Make or buy? Test both.

In SIMCEL, each asset carries its own cost model. An outsourced warehouse or a contract manufacturer is a variable cost: you pay for what goes through. Your own plant is a mix of fixed and variable cost, and the fixed part is spread over whatever goes through it. So the unit cost moves with volume and mix, as it does in the business. That is what makes these decisions testable.

Unit cost against annual volume

Unit cost · Own plant
€5.10
Unit cost · Contract manufacturer
€4.60
Cheaper option
Contract manufacturer
Saving per year
€0.3M
  • Own plant (Unit cost)
  • Contract manufacturer (Unit cost)
  • Annual cost: Own plant €3.1M · Contract manufacturer €2.8M

Make or buy

In-house against outsourced, for production or for logistics, on the same demand scenarios.

Invest

A new line, a larger site, a new warehouse. The return on the investment, under several volume and mix assumptions.

Where the fixed cost lands

Fixed costs follow the products and the customers that use the asset. No average rate.

The answer changes with volume. So test it at several volumes.

The same model, down to the order.

Short-term planning (S&OE) runs on the same model, on a shorter horizon and at transaction level. It replays each flow from order to delivery, and gives the finest estimates of inventory, cost and capacity. The scenario you choose becomes the plan of record. It goes back to your ERP as purchase, production and transfer orders.

  1. 01

    Monthly plan: the decision

  2. 02

    Short-term plan: the detail

  3. 03

    ERP: the orders

Questions supply leaders ask.

One company, one model

A supply plan the plant can run and finance can sign.

In SIMCEL, the supply plan answers a demand plan it shares a model with, and it carries its own P&L. Sales sees what can be delivered. Finance sees cost, inventory and working capital on the same scenario. So the review chooses between options that are all feasible.

Test the plan before you commit it.