# Know what your network can carry, and what it costs.

> SIMCEL tests every scenario against the real limits of your plants, hubs and DCs, then shows the gap as lost revenue, service level and working capital.

Canonical: https://www.simcel.io/supply
Language: English
Other languages: Vietnamese https://www.simcel.io/vi/supply/index.md, French https://www.simcel.io/fr/supply/index.md, Japanese https://www.simcel.io/ja/supply/index.md
Index: https://www.simcel.io/llms.txt

SIMCEL tests every demand scenario against the real limits of your plants, warehouses and suppliers. It shows what you can deliver, what you must hold and what it costs, before sales and finance commit to the number.

The plan looks fine until supply says otherwise.

Sales commits to a number. Finance builds the budget on it. Then the plants and the warehouses show that the volume does not fit. The feasibility check comes last, when the two other functions have already agreed.

- **The commercial number is not the constraint.** A plan can look right until it meets physical capacity.
- **The answer arrives too late.** Feasibility is checked after sales and finance have aligned.
- **The debate becomes spreadsheet reconciliation.** Teams compare versions, not tested options.

Capacity is not one number.

A plant's capacity depends on the mix it runs. A truck costs the same half empty. A minimum order does not care about your forecast. SIMCEL models these flows as they happen: purchase, production, transfer and delivery, transaction by transaction. So the plan it returns is one the plant can run.

- **Plants, hubs and DCs.** Each site's load, month by month, against its real limits.
- **Flows, not averages.** Purchase, production, transfer and distribution, as transactions.
- **Consequences already attached.** What cannot be served, what must be held, and what it costs.
- **Materials and suppliers.** Lead times, minimum orders and sourcing options join the same model.

See where the network breaks, and what it means.

## Capacity

- **Capacity.** Each plant, hub and DC shows its monthly load as a share of capacity. Overloaded periods surface immediately.
- **See the first break.** Find which site binds first and when.
- **Network verdict.** Can the network carry this plan?

## Sites

- **Peak load.** See the highest pressure point by site.
- **Unhandled volume.** Quantify the volume the constrained site cannot carry.
- **Plants, hubs and DCs.** Test monthly load against the limits of each site.

## Service & stock

- **Service level.** Demand against what the network can actually serve.
- **Lost revenue.** Translate the service gap into commercial consequence.
- **Stock & working capital.** See the inventory position required by the target service level.

Compare the trade-offs side by side.

- **Current operating plan.** The reference: capacity, service and working capital.
- **More demand, more pressure.** Where the extra volume binds first.
- **A network shock.** The service and revenue impact, priced in advance.

A dairy manufacturer in Australia tested a shorter delivery lead time in the simulator. Its time-to-survive a disruption and its profit at risk both changed materially.

Questions supply leaders ask.

- **Does SIMCEL replace our ERP?** No. The ERP records and executes. SIMCEL decides what it should execute, and sends the chosen plan back.
- **What if our data isn’t clean?** Nobody’s is. Building the model shows which gaps matter, and which do not.
- **Which sites does it cover?** Every site you choose to model: plants, hubs, distribution centres and suppliers. Most companies start with one scope.
- **We already run a supply planning suite.** Keep it. SIMCEL takes its supply plan, and adds the scenarios and the P&L. Or run supply planning in SIMCEL.

Put your network against your plan.

Bring next year's volume, or the disruption you fear most. We run it through your network and show what breaks first, and what it costs.

Explore Financial Planning

Go deeper: the white paper "Optimal, and Still Wrong"

The right service level is not 99%.

Most companies set a service target by habit, then pay for the stock it needs. SIMCEL simulates the policy itself. Service level, safety stock and order quantity are tested against margin, write-offs and the cost of capital. You see where profit peaks, product by product, and you set the target there.

Profit-optimal point: 96%

Target set at the profit-optimal point, not at 99%.

A supply scenario is built from events: a line down for four weeks, a supplier lost, a new warehouse, a longer lead time. Each one is priced in service, revenue and working capital before it happens, and set beside the current plan.

In SIMCEL, each asset carries its own cost model. An outsourced warehouse or a contract manufacturer is a variable cost: you pay for what goes through. Your own plant is a mix of fixed and variable cost, and the fixed part is spread over whatever goes through it. So the unit cost moves with volume and mix, as it does in the business. That is what makes these decisions testable.

- **Make or buy.** In-house against outsourced, for production or for logistics, on the same demand scenarios.
- **Invest.** A new line, a larger site, a new warehouse. The return on the investment, under several volume and mix assumptions.
- **Where the fixed cost lands.** Fixed costs follow the products and the customers that use the asset. No average rate.

The answer changes with volume. So test it at several volumes.

The same model, down to the order.

Short-term planning (S&OE) runs on the same model, on a shorter horizon and at transaction level. It replays each flow from order to delivery, and gives the finest estimates of inventory, cost and capacity. The scenario you choose becomes the plan of record. It goes back to your ERP as purchase, production and transfer orders.

Monthly plan: the decision

Short-term plan: the detail

A supply plan the plant can run and finance can sign.

In SIMCEL, the supply plan answers a demand plan it shares a model with, and it carries its own P&L. Sales sees what can be delivered. Finance sees cost, inventory and working capital on the same scenario. So the review chooses between options that are all feasible.

Explore the Demand module

Explore the Finance module

Test the plan before you commit it.

Krakow line down 4 weeks
